All industries

Renewal traps in your electricity contract: how to avoid getting stuck

Automatic renewal, short notice windows, exit fee clauses and default contracts can lock you into the wrong price. How to find the traps and keep track of the dates.

16 October 20267 min readBy Oliwer Brewitz

Silence counts as a yes

Most business electricity contracts renew automatically if nobody terminates them in time. That sounds harmless, but the renewal is rarely on the same terms as when the contract was signed. The price can be reset, the lock-in period can be as long as the original and the contract type can be switched to the supplier's standard product. Because nothing happens on the invoice on the day the contract renews, it is often only noticed several months later.

Four traps to know about

1. Automatic renewal

Read exactly what the contract says about renewal. There are big differences between:

  • Renewal on the same terms. A fixed price signed when the market was high continues to apply, even if prices have fallen.
  • Renewal at the current price list. The supplier sets a new price or mark-up on the day the contract renews, without you having compared it with anyone else.
  • Transfer to a standard contract. When a fixed contract expires, you are moved to a variable contract with a higher mark-up and more fees.
  • Renewal for the same lock-in period. A three-year contract is renewed for three new years, not one.

2. The notice window

The contract can usually only be terminated during a certain period before it expires, for example no later than three or six months beforehand. The date that matters is therefore not the end date but the last day for giving notice. Also check how notice must be given: in writing, to which address and by whom. Notice sent through the wrong channel or by the wrong person can be rejected.

3. Exit fee clauses

A fixed price or a portfolio contract is based on the supplier having bought electricity for you in advance. If you leave the contract early, move or close a site, the supplier often charges an exit fee. It is usually calculated as the difference between the contract price and the market price for the remaining volume. If prices have fallen since you signed, the exit fee will be high.

Two things to check:

  • Is the clause one-sided? If the market price has instead risen, do you get the difference back or does the supplier keep it?
  • Is there a volume band? Many fixed-price contracts only allow a certain deviation from the contracted volume. If you use more or less, the excess or shortfall may be priced separately.

4. Default (assigned) contract

A site without an electricity supply contract still receives electricity. The network operator then assigns an electricity supplier, and the site ends up on a default (assigned) contract (anvisat avtal). This happens mainly when moving, setting up a new business or when a company takes over a business, but also if the electricity supplier goes bankrupt. According to an evaluation by the Swedish Energy Markets Inspectorate (Energimarknadsinspektionen), prices in default contracts have generally been higher than the market reference price.

The good news is that under the Swedish Electricity Act a default contract may have a notice period of no more than 14 days. Anyone who discovers the problem can therefore leave the contract quickly. The hard part is discovering it, because the invoice comes from a company you may never have been in contact with.

Worked example: what a missed window costs

Worked example: A business using 300,000 kWh a year has a fixed price of 95 öre/kWh that renews automatically on the same terms for twelve months. At the same time, a new contract could have been signed for 70 öre/kWh.

  • Difference: 95 − 70 = 25 öre/kWh
  • Extra cost: 300,000 kWh × 0.25 kr = 75,000 kr for the year

The prices in the example are made up to show the calculation. Do the same calculation with your own contract price, your volume and a current quote.

Red flags in the contract terms

  • "The contract renews automatically for a contract period of the same length"
  • "On renewal, the supplier's price in force at any given time applies"
  • "Notice must be given in writing no later than six months before the end of the contract period"
  • "On early termination, the difference between the contract price and the market price is charged"
  • "Deviation from the contracted volume is priced according to the supplier's price list"

How to keep track

  1. Make a contract list. One row per site with site ID, supplier, contract type, end date, last day for giving notice and what happens on renewal.
  2. Put the last day for giving notice in the calendar, with a reminder about nine months before the end date. That gives time to request quotes and compare without time pressure.
  3. Give notice as a precaution if you are unsure. You can sign a new contract with the same supplier if that turns out to be best, but then you are negotiating instead of being renewed.
  4. Ask for written confirmation of the notice and of any new terms.
  5. Check at every change. Moving, a change of ownership, a new site or a closure are times when sites end up on the wrong contract or exit fees are triggered.
  6. Read the first invoice after a change. If it comes from an unfamiliar electricity company or with a new price, act immediately.

Tip: When signing, ask the supplier what happens if you move, close a site or use more than contracted. The answer says a lot about how the contract is written.

How the traps look in different industries

The renewal traps are the same for everyone, but when they strike depends on how the business changes. Choose your industry for a worked example and the situation we see most often.

Book a free consultation – we analyse your electricity contract and present concrete savings opportunities, with no commitment.

Take control of your energy costs